Home >  Term: Time variance (TV)
Time variance (TV)

The difference between budgeted cost of work performed (BCWP) and budgeted cost of work scheduled (BCWS) in weeks.

0 0

Kūrėjas

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.