Home >  Term: Runaway task
Runaway task

A task that has been dispatched and does not return control to CICS within a user-specified time interval. The programme being used by this task is in a loop between two CICS requests. The task control programme ends the task after expiration of this time interval.

0 0

Kūrėjas

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.