Home >  Term: nettoändring huvudplanering
nettoändring huvudplanering

A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated.

0 0

Kūrėjas

  • Börjet
  •  (Platinum) 6618 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.