Home >  Term: uppskattning vid slut
uppskattning vid slut

The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI.

0 0

Kūrėjas

  • Börjet
  •  (Platinum) 6618 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.