Home >  Term: triangular method
triangular method

A method of ore reserve estimation based on the assumption that a linear relationship exists between grade difference and the distance between all drill holes.

0 0

Kūrėjas

  • ed.young
  • (Milwaukee, United States)

  •  (V.I.P) 21084 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.