Home >  Term: foreshaft sinking
foreshaft sinking

The first 150 ft (46 m) or so of shaft sinking from the surface, during which time the plant and services for the main shaft sinking are installed. Sometimes, the main sinking contract does not commence until the foreshaft has been completed.

0 0

Kūrėjas

  • ed.young
  • (Milwaukee, United States)

  •  (V.I.P) 21084 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.