Home >  Term: cost performance index
cost performance index

The ratio of budgeted costs of work performed to actual costs of work performed (BCWP/ACWP). The cumulative CPI (sum of the BCWP for all tasks divided by the sum of the ACWP for all tasks) can be used to predict whether a project will go over budget.

0 0

Kūrėjas

  • Maxiao
  •  (V.I.P) 19232 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.