Home >  Term: bottom-up estimating
bottom-up estimating

A principle of good scheduling. It means having those who do the work estimate the effort, rolling up task-level estimates, and recognizing that experience is the best estimating technique.

0 0

Kūrėjas

  • Maxiao
  •  (V.I.P) 19232 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.